Most articles on digital facilities management explain that centralising information improves visibility. That is true, and it is not why UK organisations are actually doing it. The drivers are a legal duty that building safety records be kept digitally, and a set of compliance deadlines that have to be evidenced rather than asserted.

Facilities management technology providers such as expansive sit in that shift. But it is worth being clear from the start about what software does and does not do: it evidences compliance, it does not create it. The duty stays with the duty holder, and a system nobody updates is worse than a spreadsheet somebody reads — because it looks like control.

This guide covers the Building Safety Act golden thread, the MEES deadlines including which ones are not law yet, the statutory intervals we could verify and the ones where sources disagree, and what to settle before buying anything.

Last updated: 12 November 2026.

The short version

  • Golden thread (Building Safety Act): digital records required for higher-risk buildings, since 1 Oct 2023 — summarised here from law-firm commentary, so verify before relying on it
  • Higher-risk means: 18m+ or 7+ storeys, with 2+ residential units
  • Commercial EPC now: E — F and G cannot be let
  • From 2031 (proposed): EPC B over 1,000 m²; under that, stays at E
  • EPC C by 2027: abandoned
  • Lifts: 6 months carrying people, 12 for goods
  • What software won’t do: make you compliant

What this article covers

  1. The actual reason this is happening
  2. The golden thread, in detail
  3. The compliance calendar
  4. MEES: what is law and what is only proposed
  5. Statutory intervals — and where sources disagree
  6. What digital FM does and does not do
  7. What to settle before buying anything
  8. How to tell whether it worked
  9. Corrections and additions made to this page
  10. Frequently asked questions

The Actual Reason This Is Happening

  • A legal duty that records be digital. The Building Safety Act 2022 golden thread requires safety information for higher-risk buildings to be kept digitally and securely as a single source of truth. That is a statutory requirement about the format of records, which is unusual and is the strongest driver here.
  • Compliance that has to be evidenced, not asserted. An EPC threshold, a lift examination interval or an overdue inspection is either documented or it is not.
  • Deadlines that move. The proposed EPC C by 2027 milestone was dropped and replaced with EPC B by 2031 for larger buildings — so the useful capability is being able to re-run your portfolio against a changed target, not a one-off survey.
  • Contractor churn. Asset history that lives in one person’s inbox leaves when they do, and this is where the practical pain usually starts.
  • Multi-site comparison. Different plant, contractors and schedules per building make “which site is behind?” unanswerable on paper.
  • None of which is an argument for any particular product — and the sections below include what software will not fix.

The Golden Thread, in Detail

The positionNote
Which buildingsHigher-risk buildings — broadly at least 18 metres tall or at least 7 storeys, containing at least two residential unitsMixed-use blocks with commercial ground floors can fall inside this
Since when1 October 2023Design and construction requirements were phased in from that date
What formKept digitally, kept securely, and acting as the building’s “single source of truth”This is the part that makes digital record-keeping a legal matter rather than an efficiency choice
Who holds it — design and constructionThe client is ultimately responsible for creating and maintaining itDocuments for the design phase are set out in the Building (Higher-Risk Buildings Procedures) (England) Regulations 2023
Who holds it — occupationAccountable Persons and the Principal Accountable PersonAn Accountable Person owns, or has a legal obligation to repair, common parts of an occupied higher-risk building
What it has to containInformation relevant to the building and how it complies with the Building RegulationsDetailed lists sit in secondary legislation, not the Act itself
How certain is all this?Summarised from law-firm commentary, not from the regulator’s own textVerify against legislation.gov.uk and the Building Safety Regulator before relying on it for compliance

Summarised from law-firm commentary: Mishcon de Reya, Edwin Coe and DWF. Not taken from the regulator’s own text — verify against the Building Safety Regulator and legislation.gov.uk before relying on it for compliance.

The reason this matters beyond higher-risk residential blocks is that it sets an expectation. Once “kept digitally, securely, as a single source of truth” is the standard the law applies to the buildings it cares most about, it becomes the reference point for what adequate record-keeping looks like everywhere else — in procurement, in insurance, and in a dispute.

The Compliance Calendar

What changed, and what is coming
April 2023 – MEES applies to all commercial lettings. A property rated F or G cannot be let, or continue to be let, unless raised to E or a valid exemption is registered.
1 October 2023 – The Building Safety Act golden thread takes effect. Safety information for higher-risk buildings must be kept digitally and securely, as the building’s single source of truth.
18 June 2026 – Government interim response on MEES. Confirms an EPC B target for larger non-domestic lettings from 2031 and abandons the previously proposed EPC C by 2027 milestone.
2031 — proposed, not yet law – Privately rented non-domestic buildings over 1,000 m² to reach EPC B where cost-effective. Until secondary legislation passes, EPC E remains the legal standard.

Note the shape of that list: one date was removed and replaced with a later, different target. The EPC C by 2027 milestone was formally abandoned and EPC B by 2031 put in its place for larger buildings, per the government’s 18 June 2026 interim response. That is the argument for keeping portfolio data in a form you can re-query, rather than commissioning a survey against whichever target was current that year.

MEES: What Is Law and What Is Only Proposed

Proposed non-domestic MEES position by building sizeProposed non-domestic MEES position by building size1,000 m²Over 1,000 m² — EPC B proposed for 2031: 50.0%Under 1,000 m² — stays at EPC E: 50.0%

Our own breakdown of the stated policy, not a statistic. Based on Jones Day and Travers Smith on the government’s 18 June 2026 interim response. Neither position is legislated yet.

  • What is law now: EPC E. Since April 2023, a commercial property rated F or G cannot be let or continue to be let unless raised to E or a valid exemption is registered.
  • What is proposed: EPC B from 2031 for privately rented non-domestic buildings over 1,000 m², where cost-effective. Some sources state the target without that qualifier — we have kept it.
  • Under 1,000 m²: stays at EPC E, with no deadline set for anything stricter.
  • EPC C by 2027 is gone. Formally abandoned, having been the headline number in a great deal of earlier coverage.
  • Until secondary legislation passes, none of the 2031 position is enforceable. Plan for B, comply with E, and treat any article reporting 2031 as settled law with caution.
  • Exemptions have to be registered to count. An unregistered exemption is not an exemption, which is a records problem as much as an energy one.

Statutory Intervals — and Where Sources Disagree

Lift thorough examination interval (months)Lift thorough examination interval (months)6Lifts carrying people12Goods-only lifts

LOLER factsheet, Coventry City Council: at least every 6 months where a lift is used at any time to carry people, or 12 months for loads only — or in accordance with an examination scheme drawn up by a competent person.

Asset or dutyIntervalConfidence
Lifts carrying peopleThorough examination every 6 monthsVerified. Or at intervals set by an examination scheme drawn up by a competent person after a risk assessment of the lift’s type, use, age and condition
Goods-only liftsEvery 12 monthsVerified. Same scheme alternative applies
Lift examination recordsKeep at least 2 yearsVerified — and a routine reason FM systems get adopted
Fixed electrical inspection (EICR)Sources conflict: 5 years or 3 yearsWe are not picking one. One source gives 5 years as appropriate for most commercial premises and 3 for industrial; another cites 3 years for commercial. Check HSE and your insurer
Legionella risk assessment reviewNo interval given hereWe could not verify one. The risk assessment itself sets the monitoring schedule — check ACoP L8 directly
Everything elseVaries by asset, use and insurerTreat any article’s compliance calendar as a prompt, not an authority — including this one

Lift intervals per Coventry City Council’s LOLER factsheet; electrical inspection positions per Munich Re UK technical bulletin and other trade guidance, which conflict. Verify everything here against HSE and your insurer — and see HSE on legionella for water systems.

Publishing “sources conflict” instead of a tidy number is the honest option, and it is also the useful one. A compliance schedule built on a figure somebody picked from a blog is a worse liability than no schedule at all, because it is relied upon. Insurance conditions are frequently stricter than statutory guidance, and they are the ones that bite first.

What Digital FM Does and Does Not Do

ClaimHonest answerNote
Finds the recordYes, and this is the honest core benefit. One place for asset history, work orders and inspection records instead of three spreadsheets and an inboxBiggest single gain when staff or contractors change
Stops requests being lostYes. Logging, categorising, prioritising and assigning beats an email chainDuplicated and forgotten jobs are the usual starting pain
Shows what is overdueYes — planned maintenance schedules against completion recordsThis is what turns a compliance deadline into a visible task
Surfaces repeat failuresYes, if the data is entered consistentlyThree repairs on one asset is a replacement-planning signal, and easy to miss on paper
Creates complianceNo. The duty stays with the duty holderSoftware evidences compliance; it does not supply it. A system nobody updates is worse than a spreadsheet somebody reads
Removes administrationNo — it moves it. Less re-keying, but data entry and configuration are real ongoing workImplementations fail on data quality and training, not on features
Fix an unclear responsibilityNo. If nobody owns an asset, a system records that nobody owns itDecide ownership first, then choose software

Our assessment, written against the duties described above. No product is endorsed and no vendor claim is repeated here.

What to Settle Before Buying Anything

  • Write down who the duty holder is, per building and per asset. For higher-risk buildings in occupation that means identifying the Accountable Persons and the Principal Accountable Person. Software cannot resolve an unclear responsibility — it records that it is unclear.
  • Build an asset register that is actually accurate, even if it starts as a spreadsheet. A platform built on an inaccurate register reproduces the inaccuracy faster and with more confidence.
  • List the compliance dates you are tracking, and mark which are statutory, which are insurance conditions and which are proposals not yet in force.
  • Decide who enters data and when. This is the step that decides whether the project works, and it is the one usually left to “we’ll sort that in rollout”.
  • Agree how contractors will be given and return information before configuring anything.
  • Then choose software. Reviewing business systems generally? See our pieces on how demand for business systems is shifting, comparing platforms properly and evaluating software tools.

How to Tell Whether It Worked

  • Proportion of planned maintenance completed on time. The simplest measure, and usually the first to expose a scheduling problem.
  • Count of overdue statutory items. Should be zero, and the point is being able to say so with evidence.
  • Share of assets with a complete service history. The measure that tells you whether the data is being maintained rather than just collected.
  • Repeat failures per asset. Three repairs on one unit is a replacement-planning signal, not three jobs.
  • Time to answer a question from a cold start. Hand someone who joined last week an asset and ask for its last service date. That is the whole business case in one test.
  • If after a year the honest answer is “we still cannot tell”, the data is not being kept current — which is a process failure, not a software one, and buying a different platform will reproduce it.

Corrections and Additions Made to This Page

What changedWhy
Nothing was removed for being false. We found no fabricated claims and no invented statistics in the originalWorth stating. The problem was the opposite: 1,147 words with zero sources, zero dates and zero legislation — nothing a reader could verify or disagree with
No mention of the Building Safety Act 2022 golden threadThe strongest argument the page could have made, and it was absent. Since 1 October 2023, safety information for higher-risk buildings must be kept digitally and securely as a single source of truth. Added, and attributed to law-firm commentary rather than presented as regulator text
No mention of MEES or EPC thresholdsAdded: EPC E now (F and G unlettable since April 2023), EPC B proposed for 2031 above 1,000 m² per the 18 June 2026 interim response, EPC C by 2027 abandoned — and the fact that none of the 2031 position is legislated yet
No statutory inspection intervalsAdded where verified: lifts 6 months carrying people, 12 months goods-only, records kept 2 years
—Where sources conflict, the page now says so rather than picking. Fixed electrical inspection is given as 5 years or 3 years, disputed; no legionella review interval is stated, because none could be verified
Benefits asserted throughout with no counterweight — “centralising information”, “clearer workflows”, “improved visibility”Added what software does not do: it evidences compliance, it does not create it; it moves administration rather than removing it; and it cannot fix an unclear responsibility. This now appears next to the outbound link, not buried
Nothing on what to settle before buyingAdded: duty holder, accurate asset register, compliance date list, who enters data — in that order, before software
No way to judge successAdded measurable tests, including the useful one: hand someone who joined last week an asset and ask for its last service date
Zero sources, zero tables, zero chartsRebuilt with legislation, HSE and law-firm sources throughout, two charts, a timeline, four tables and FAQ JSON-LD
Zero imagesStill zero. No properly licensed image was available and we will not hotlink one

All changes made on 12 November 2026. The outbound link was kept with its URL, anchor text and dofollow status unchanged.

Frequently Asked Questions

What is digital facilities management?

Using software to hold building and asset records, schedule maintenance, assign work and evidence compliance in one place, instead of across spreadsheets, paper and email. The practical test is whether someone who joined last week can find an asset’s maintenance history without asking anyone.

Is digital record-keeping actually a legal requirement in the UK?

For higher-risk buildings, yes. Under the Building Safety Act 2022 golden thread duty, in force from 1 October 2023, safety information must be kept digitally, kept securely, and serve as the building’s “single source of truth”. A higher-risk building is broadly one at least 18 metres tall or with at least 7 storeys, containing at least two residential units. This is summarised from law-firm commentary — verify against the Building Safety Regulator before relying on it.

Who holds the golden thread?

The client during design and construction; Accountable Persons and the Principal Accountable Person during occupation. An Accountable Person is whoever owns, or has a legal obligation to repair, the common parts of an occupied higher-risk building. If that is not written down somewhere, that is the first problem to solve — before any software decision.

What EPC rating does a commercial property need?

E, now. Since April 2023 a commercial property rated F or G cannot be let or continue to be let unless raised to E or a valid exemption is registered. From 2031, privately rented non-domestic buildings over 1,000 m² are proposed to need EPC B where cost-effective, confirmed in the government’s 18 June 2026 interim response. Below 1,000 m² the standard stays at E with no deadline.

Is the 2031 EPC B target law yet?

No, and this matters. Until secondary legislation is passed, EPC E remains the legal requirement. The earlier proposal of EPC C by 2027 has been formally abandoned, which is a useful reminder that announced targets move. Plan for B; comply with E.

How often do lifts need examining?

Every 6 months if the lift carries people, 12 months if it carries goods only — or at intervals set by an examination scheme drawn up by a competent person after a risk assessment. Keep the records for at least two years.

How often does fixed wiring need inspecting?

We are not going to give you one number, because the sources disagree. One gives 5 years as appropriate for most commercial premises and 3 for industrial; another cites 3 years for commercial. Check HSE and your insurer — insurance conditions are often stricter than guidance, and they are the ones that bite.

Will FM software make us compliant?

No. It evidences compliance; it does not create it. The duty stays with the duty holder whatever system is in place, and a platform nobody updates is worse than a spreadsheet somebody actually reads — because it looks like control. Accurate data and trained users are the whole game.

Does it reduce administration?

It moves administration rather than removing it. Less re-keying and fewer status-chasing emails, but data entry, configuration and keeping asset records current are real ongoing work. Implementations usually fail on data quality and training, not on missing features.

Is it worth it for a small business?

It depends on how many assets and sites you are responsible for, not on headcount. One office with a landlord handling plant is a different problem from three sites with your own boilers, lifts and contractors. If you can list every asset and its last service from memory, you probably do not need a platform yet.

What should we sort out before buying anything?

Three things, in order. Who is the duty holder for each building and asset — write it down. An asset register that is actually accurate, even if it is a spreadsheet to begin with. And which compliance dates you are tracking. Software built on an inaccurate asset register reproduces the inaccuracy faster.

How do we judge whether it worked?

Pick measures you could not produce before. Proportion of planned maintenance completed on time, overdue statutory items, assets with a complete service history, and repeat failures per asset. If the honest answer after a year is “we still cannot tell”, the data is not being maintained — which is a process problem, not a software one.

Final Thoughts

The case for digital facilities management in the UK is not really about efficiency. It is that the law now expects building safety records to be digital, and that compliance has to be evidenced on demand against targets that keep moving. A spreadsheet can hold the data; what it cannot do is answer “what is overdue, across every site, today” without somebody spending an afternoon on it.

But the honest caveat belongs at the end as well as the beginning: no system makes anyone compliant. Settle who the duty holder is, get the asset register right, know which deadlines are law and which are proposals — and only then buy something. Software built on an inaccurate register just produces wrong answers faster. See also our guide to workplace duties under the DSE Regulations. More from The UK Post.

Sources

Disclaimer

This page is general information, not legal, compliance or professional advice. The golden thread and MEES positions are summarised from law-firm commentary, not from the regulator’s or legislature’s own text, and detailed requirements sit in secondary legislation that may have been amended — verify against legislation.gov.uk and the Building Safety Regulator. The 2031 EPC B position is a government proposal and is not legislated; EPC E remains the current legal standard. Where sources conflict on inspection intervals, this page reports the conflict rather than choosing, and no interval here should be used as a compliance schedule — check HSE, the relevant Approved Code of Practice and your insurer, whose conditions are often stricter. No product is endorsed. Information correct as at 12 November 2026.